The process of bond plastic pipe production made by plastic pipe production line is listed follows:

First, wipe and clean the adhesive the outer side and the jack handle of plastic pipe made by plastic pipe production line with a dry cloth. If the surface of plastic pipe production line has oil, it should be clean with acetone.

Second, apply adhesive should be applied bearing inside mouth of plastic pipe production line, then smear the outside jack, socket should be applied along the axial amount evenly from the inside out, not painted or coated drain excess (200g/m2).

Third, after the adhesive applied, it should be applied within 1 minute to keep the force constant, maintain the straightness of the interface produced by plastic pipe production line and the correct position.

Fouth, after bonding, wipe the excess adhesive during the curing period shall be subjected to force or forcibly loaded.

Fifth, adhesive plastic pipe made by plastic pipe production line joint construction shall not be in the rain or water, the temperature shall not operate below 5℃.

Sixth, adhesive plastic pipe program of plastic pipe production line: prepare→cleaning brush face →test plug→adhesive bonding→conservation.